After-Sales and Maintenance Performance
|
NO.
|
Equipment Name
|
Business Content
|
Number
(stage)
|
Engineering
Project
|
Finish Time
|
Function
Situation
|
1
|
gate,hoist and electrical system
|
Manufacture
, installation
|
|
Pakistan
Dang SA Hydropower Station
|
2006/10-2009/8
|
Good
|
2
|
420/50t overhead crane
|
Manufacture
, installation
|
1
|
Hengyang
Hunan large terminal
|
2004/6/-2004/12
|
Good
|
3
|
arc
gate,flat gate,hoist
|
Manufacture,
installation, reinforcement
|
1,1,3
|
Fengjiashan
Reservoir
|
2005/2-2005/6
|
Good
|
4
|
arc
gate,flat gate
|
Manufacture
, installation
|
5,4
|
Kazakhstan
syrdarya hydropower dam project
|
2004/10-2005/3
|
Good
|
5
|
The
metal structure of the Zipingpu Reservoir
|
Maintenance
|
|
The
Zipingpu Hydropower Station
|
2007/5-2010/3
|
Good
|
6
|
Shuikou
2*500kN draft tube one way gantry crane
|
Transformation
|
1
|
Fujian
hydraulic power plant
|
2009/3-2009/8
|
Good
|
7
|
Pingban
crest and draft tube gantry crane
|
Manufacture
, installation
|
2
|
Guangxi
Ping Hydropower Station
|
2009/9-2009/11
|
Good
|
8
|
2*500kN
draft tube one way gantry crane and track
|
Manufacture
, installation
|
1
|
Danjiangkou
Hubei hydroelectric power plant
|
2003/5-2003/8
|
Good
|
9
|
Zipingba
reservoir metal structure
|
Maintenance
|
|
The
Zipingpu Hydropower Station
|
2009/11-2010/3
|
Good
|
10
|
Outlet
sand gate maintenance
|
Manufacture
, installation
|
1
|
Sichuan
Shawan Hydropower Station
|
2007/5-2007/10
|
Good
|
11
|
power
house intake trashcrack panel
|
Manufacture
, installation
|
12
|
Sichuan
Shawan Hydropower Station
|
2007/7-2007/11
|
Good
|
12
|
canal
hoist and embedded
|
installation
|
|
Leshan
Dongfeng weir
|
1998/3-1998/10
|
Good
|
13
|
Crest
gantry crane and draft tube trolley
|
installation
|
|
Guangxi
Le Tan Hydropower Station
|
2002/4-2002/11
|
Good
|
14
|
2000/22*400kN
two way gantry crane
|
installation
|
1
|
Sichuan
Ertan Hydropower Station
|
1998/5-1998/10
|
Good
|
15
|
2*1250kN
gantry crane and track,floating gate
|
Manufacture
, installation
|
|
Gongzui
Hydropower Station
|
2004/2-2004/5
|
Good
|
16
|
gate,hoist
equipment
|
Manufacture
, installation
|
|
Xianyang
Pavilion
|
2009-
|
Good
|
13
|
Lifting gantry
crane of draft tube gate,lifting gantry crane of intake maintenance gate,the
mid outlet hole gate lifting gantry crane repair
|
Maintenance
|
3
|
Chongqing
Jiangkou Hydropower Station
|
2010/4-2010/6
|
Good
|
14
|
crest
gantry crane maintenance
|
Maintenance
|
2
|
Yangtze
River Three Gorges Project
|
2008/12-2009/2
|
Good
|
15
|
5000kN
gantry crane lifting beam cable and cable maintenance
|
Maintenance
|
1
|
Danjiangkou
Hubei hydroelectric power plant
|
2010/3-2010/5
|
Good
|
16
|
L
type gantry crane 2010 annual maintenance project
|
Maintenance
|
1
|
Le
Tan Hydropower Plant
|
2010/4-2010/5
|
Good
|